10 case studies
Biasicom

Integrated solution for appliances retail company, Biasicom

image/svg+xml 2018. January 15.

The need for analysis tools, reporting and evolution of the main indicators of this aspect of the company's activity, has raised awareness of the need for change of the existing solution.

Electromagnetica

Electromagnetica choose to implement Microsoft Dynamics AX solution with XAPT Solutions

image/svg+xml 2018. August 08.

Electromagnetica has made a major step with this implementation. We switched from our own application, developped in the early 90’s to an international solution. Without doubt, such a step influences the internal structure of a society, adding a percentage of risk to the implementation.

Eni

Eni Romania chose XAPT Solutions for implementing Microsoft Dynamics NAV

image/svg+xml 2018. January 15.

Microsoft Dynamics NAV by XAPT Solutions had made a significant difference to Eni Romania overall business efficiency.  

Euromaster

Microsoft Dynamics NAV replaced an old system which was not able to keep up with the business growth anymore

image/svg+xml 2018. January 15.

It became necessary to change the outdated ERP system to Microsoft Dynamics NAV. Functionalities adapted to the business needs and specific type of activities we have were a must have.

Hartl

Microsoft Dynamics AX, able to meet all the business requirements of Hartl

image/svg+xml 2018. January 15.

The company wanted a solution that could cover the Group requirements, in order to reduce the working time for reporting and to receive data in a real-time manner.

Phoenix Mecano

Microsoft Dynamics NAV in the manufacturing industry

image/svg+xml 2018. January 15.

Phoenix Mecano was using three software applications, but there were malfunctions with the interconnection of those systems.

Preturi Pentru TIne

Preturi Pentru Tine carries forward its business with Microsoft Dynamics NAV

image/svg+xml 2018. January 15.

Preturi Pentru Tine (PPT) used a solution which, in the context of an expansion, couldn’t cover all the areas of its Business, both at local and international level.

Quipu

QUIPU implemented Microsoft Dynamics AX with XAPT Solutions

image/svg+xml 2018. January 15.

Due to extensive and complex requirements for the reporting process, the functionality of the system was gradually exceeded.

Rebu

Microsoft Dynamics AX substitutes an old solution for REBU (RER)

image/svg+xml 2018. January 15.

The lack of integration in the previous systems led us to choose an ERP solution truly integrated.

Stihl

STIHL Romania – the FIRST Microsoft Dynamics NAV project in Romania

image/svg+xml 2018. January 15.

The ERP solution had to comply with the requirements of STIHL Romania, offering a consistent group support. The solution was going to ensure the optimization of the logistic and financial flows, allowing also the easy integration with various systems existing in the group.

1/2